Direct fit Hot sale auto parts Ceramic exhaust Catalytic Converter for Lifan 320

How to install the three-way catalytic converter

①Use 8 bolts to install 2 heat shields on the new preheated three-way catalytic converter.

② Install the new gasket, retainer and sealing gasket on the preheating three-way catalytic converter.

③Use 3 bolts and 2 new nuts to install the preheating three-way catalytic converter, and the tightening torque is 29N.m.

④ Install the exhaust manifold bracket with bolts and nuts, and the tightening torque is 42N.m.

⑤Use bolts and nuts to install the No.1 exhaust manifold bracket with a tightening torque of 42N.m.

⑥ Connect the secondary oxygen sensor connector. 


Product Detail

Product Tags

About Car

As an AO model, Lifan 320 is the first mini-car developed by Lifan Motors, and it is mainly developed and designed for young people. The body shape of Lifan 320 draws on and incorporates the design elements of classic models. Different from MINI's big and round signature headlights, Lifan 320 headlights are in the shape of peanuts, which looks playful but simple and honest, very cute.

Parameters

Carfitment
OE NO. Car Fitment: Mold Year:
- Lifan 320 - 2017-
         
Product name Lifan 320
Model Number DJN515
Brand Name DJN
Emission Standard: EURO 2/3/4/5
Material Inside : ceramic(honeycomb) substrate 400cpsi with mat
  Shell :304 or 409 # stainless steel shell,stainless steel pipe
Oxygen sensor ports Yes
cpsi 400 /600/800
Wall thickness 0.09±0.025
Warranty 30000 miles performance/2 years
Packaging: Air bubble film and Carton Packing
MOQ: 50 pcs
Supply Ability 1000 Piece/Pieces per Week
Place of Origin: Jiangsu 
SAMPLE ORDER: Accept 
Condition new 
Function reduce harmful emission (CO,HC,NO) from motor vehicle Over 95% conversion efficiency;
Service Customers' specific demands available, design drawings are welcomed. OEM service is accepted
Supply Ability 1000 Piece/Pieces per Month
Packaging & delivery Air bubble film and Carton Packing, inside fix the product decently with expanded material
Port Shanghai/Ningbo
Lead time: 10-30 days .
Active catalyst ingredients Pt, Pd, Rh, and rare earth elements
Shape round, oval, race track

 

H15decba8b1184e008906da90a7b1b9473.jpg_960x960(1)(1)
H15decba8b1184e008906da90a7b1b9473.jpg_960x960(1)
Hec02dff40d384d37a85de0f305b63714D.jpg_960x960(1)(1).
Hec02dff40d384d37a85de0f305b63714D.jpg_960x960(1)
Hec02dff40d384d37a85de0f305b63714D.jpg_960x960(1)(1)
图片1
图片2
7c0494940b300a7d97d443d1762e7fa
b453759e6d24af380b758954f29d026
微信图片_20230217205828
3aa944fd55d66049e97595b646164f1
392006b537b163fe321730f92591e19
5b25b43ffa296e2e64b318ae9e27816
4b7894b44ebdecefa8cadc058750fa7

  • Previous:
  • Next:

  • Write your message here and send it to us